Local Storage seems to be disabled in your browser.
For the best experience on our site, be sure to turn on Local Storage in your browser.

Carmo will be closed due to Easter on Mondag April 1st. Webshop orders will be shipped from Tuesday April 2nd.
Suzuki VL1800 ECU ECM CDI black box computer brain (32920-22H30, 112100-6450)

Suzuki VL1800 ECU ECM CDI black box computer brain (32920-22H30, 112100-6450)

Suzuki VL250 Intruder igniter ignition module CDI TCI Box (32900-27F30, 131800-8190, DENSO)

Suzuki VL250 Intruder igniter ignition module CDI TCI Box (32900-27F30, 131800-8190, DENSO)

Suzuki VL250 Intruder igniter ignition module CDI TCI Box (32900-27F00, 131800-7500, DENSO)

Availability: In stock
Model
Suzuki VL250 Intruder igniter ignition module CDI TCI Box (32900-27F00, 131800-7500, DENSO) Research / Repair
SKU
CARU-SU-VL250-INTRUDER-32900-27F00-131800-7500-DENSO
$267.77 $221.30
  •  This is a repair service for your unit.
  •  Default listed price is the repair price.
  •  If we can repair it, this is the price. (Without any additional prices like Quick-Service)
  •  If we are not able to find the fault in the unit, we will only charge research costs,
  •  With exception of products that will be remanufactured as standard.
 Pickup Service  Send it yourself

CLICK HERE, for downloading the Test/Repair form (PDF)
or as Word document (DOC)



Testing Ignition unit

You pay this amount if your unit has been tested by Carmo.
Testing within 3 working days.
(We also offer a fast service, with delivery by 10:00, ready after 16:00 Mon-Fri)

Test procedure:
Our tests are Simulation-based tests, all signals that are offered to the unit are simulated on our unique test table.
This way we can approach the reality close to 100%. We test dynamic, not static measures such as using tables from the workshop manual.

What is tested?:
- Variable load on outputs
- Advance ignition curve relative to the rpm
- Power of the spark at variable load
- Charging of the ignitioncoil in TCI systems and peak voltage at CDI Systems
- Operation at different voltages (8V - 15.5 V)
- Temperature dependence
- Idle up to the rpm limiter
- Endurance test, at least 25 minutes (longer on request)
- Vibration
- Water resistance
- Electromagnetic compatibility tests
- If present, tachometer output, Electronic fuel pump output, TPS and vacuum input, standard / neutral safety

If possible, the circuit board will be provided with two layers of professional moisture protective coating after testing.

Team-Carmo


Write Your Own Review
Only registered users can write reviews. Please Sign in or create an account